Skip to main content

Computer Loft Complete!

Once you start unpacking it is hard to stop. Case in point: Once my study was setup, Michelle and I decided to setup the “personal” computer area that we designated in the loft.

We had the house prewired with CAT5 so we have three ports in the loft along (smart thinking huh?).

Of course, we have some extra AC Adapters that we have no idea where they go. We will find out where they go in the future (in a galaxy far, far away)…

The desks you see below were the same ones that we had before. We just added an additional desk and corner piece to each one. Now we have twice+ the original size for more money.

 

IMG_5635-2014-08-14-18-22.jpg

 

 

IMG_5636-2014-08-14-18-22.jpg

 

 

IMG_5637-2014-08-14-18-22.jpg

Comments

Popular posts from this blog

Drywall Has Started!!

We got an email from Courtney (our beloved sales lady @ Richmond/American Homes) stating that the drywall material was dropped off at the new house yesterday and they will start drywalling immediately. We went by the house today to take a look. We opened the front door and immediately saw four of the laborers sitting against the wall enjoying lunch (and a bit of music). I am not sure who was more surprised to see who! I should have snapped a picture of them sitting there with jaws agape. Definitely a Kodak moment. The upstairs is almost completely drywalled since the blew in the attic insulation earlier in the week and the ground floor is about half way done. I guess that they will start the basement soon. Did I mention that we opted for the finished basement? I probably did but I like repeating it since it will be cool to have a finished basement. Michelle stated that it will be a cool place to build a fort. Oh wait, I think she said that about the master bedroom walk in clo

Trip To IKEA

We have been contemplating going to IKEA all last week and decided to make today “IKEA Day”. We have been looking at for a wall unit/entertainment center for the living room. The wall that we are planning on using has 111” of space available. We figured that the modular units that IKEA sells would be a good place to start. Here is a picture of what we currently have: As you can see, the wall currently looks like shit. That is about to change. So, as you know, we went to IKEA today and we found three units that we both liked. Scratch that, we actually found two that we liked and one that we kinda of sorta liked but not enough to post a picture here on my blog. Do you think you can tell which unit we bought? To help you make your choice, remember that our hardwood floors are dark and the walls are a beige color. This unit is totally modular so you can make it fit your lifestyle. We like the way that it is suspended off of the floor.     We like this one also. The glass fronts

Jordan Day 1

 It's been almost three years since we had payed for our trip to Jordan and Israel.  THREE FUCKING YEARS! We finally went and had a great time.   The trip lasted almost a month and we started our adventure in Amman, Jordan.  We arrived a day early so we could acclimate to the time change (nine hour difference).   We had purchased some Briggs and Riley high end luggage in hopes to carry them on the plane due to all of the recent horror stories of lost and or delayed baggage.  No such luck!  We were forced to check our bags at the gate in Denver.  If we had known our bags would have to be checked, we would have brought a lot more clothes and a much bigger suitcase.  We only brought six days of clothes (with an extra abundance of underwear and socks).   The planes were on time and we arrived in Amman a bit tired and eager to get going.   Our first hotel was the House Boutique Hotel which was really comfortable.  The hotel had a roof top pool and most importantly, a roof top bar. A lit