The walk through went well. We put several dots on items that need to be corrected.
Did I mention that we did the walkthrough without power?
From what we were told, Xcel is coming out tomorrow (August 1st) to reconnect the power line and then bury the cables and finally install the meter on the house. We were assured that the work would be completed by Tuesday at the latest. Since we are doing the final walk on Friday and signing the papers right after, I hope they stop of it.
Time to pack some stuff at the existing house…
Comments
Post a Comment
Thank you for stopping by. Subscribe for future posts.